This project involves the upgrade and commissioning of the Presettler Units at the WWTP, including the integration of the Presettler Plant into the SC4U control system for remote access and visualization.
This project involves the upgrade and commissioning of the Presettler Units at the WWTP, including the integration of the Presettler Plant into the SC4U control system for remote access and visualization. The scope also includes the replacement of legacy equipment such as the S7-200 Smart PLC and existing HMI, as well as the integration of VFD-controlled pit pumps. A Final commissioning and operator training was conducted to ensure smooth operations to ensure seamless operations and optimal performance.
The implementation of this upgrade has significantly enhanced the efficiency and functionality of the Presettler Units.
Overall, this project has positioned the WWTP to achieve its operational targets more efficiently and maintain compliance with regulatory standards.