Adeco Project Engineering BV West Africa Limited

Nigerian Breweries Plc Kudenda – Upgrade and commissioning of the Presettler Units at the WWTP

This project involves the upgrade and commissioning of the Presettler Units at the WWTP, including the integration of the Presettler Plant into the SC4U control system for remote access and visualization.

    • Industrial Automation
    • Nigerian Breweries Plc
    • 2024
    • NB Plc, Presetller, WWTP

Overview

This project involves the upgrade and commissioning of the Presettler Units at the WWTP, including the integration of the Presettler Plant into the SC4U control system for remote access and visualization. The scope also includes the replacement of legacy equipment such as the S7-200 Smart PLC and existing HMI, as well as the integration of VFD-controlled pit pumps. A Final commissioning and operator training was conducted to ensure smooth operations to ensure seamless operations and optimal performance.

 

Outcome

The implementation of this upgrade has significantly enhanced the efficiency and functionality of the Presettler Units.

  • Operators now have real-time access to plant data through the SC4U control system, enabling them to monitor and respond to operational needs swiftly.
  • The transition to modern equipment has reduced maintenance costs by approximately 20%and increased the reliability of plant operations, resulting in a measurable decrease in downtime.
  • The successful completion of the project also included comprehensive operator training, ensuring that staff are well-equipped to manage the upgraded systems effectively.

Overall, this project has positioned the WWTP to achieve its operational targets more efficiently and maintain compliance with regulatory standards.